Grade 12 • Phase 2, Unit S4: Running Real Jobs • Lesson 27 of 43 • 4 Days

Studio Job Cycle: Complete a Real Request, Start to Finish

🗓️ Before Class: Teacher Prep

🖥️ Slide Deck (project or share with students)

Short, on-the-board pacing slides for today's Do Now, agenda, vocabulary, and exit ticket -- the full detail lives in the handout above, not here.

🧑‍🏫 Substitute Teacher Guide

A scripted, step-by-step runsheet for today's class -- hand this to anyone covering the room who doesn't know the daily routine.

This is a real client, not a hypothetical one

Treat every request the same way a professional studio would treat a paying client: confirm the brief, communicate proactively, and get sign-off before production. The staff member's satisfaction is part of the grade.

🎯 Essential Question

📈 Learning Objectives

By the end of this lesson (4 Days), students will be able to:

  1. Independently move a real request through every stage of the studio pipeline.
  2. Apply the correct production method (print, 3D print, or video) to the job.
  3. Reflect on which pipeline stage was hardest to manage, and why.

📐 Standards Alignment

CDOS (Career Development & Occupational Studies)

Industry Standards (CCTC)

📚 Key Vocabulary

Pipeline
The full sequence of stages a job moves through, from intake to delivery.
End-to-End Ownership
Being responsible for every stage of a job, not just the design portion.

🧰 Materials & Tools

🧠 Do Now (Warm-Up)

Of everything you've learned so far this semester, what part of the studio pipeline are you most confident running on your own?

📋 Main Workshop / Lesson Sequence

This lesson spans 4 Days. Suggested pacing:

DayFocusPlan
Day 1Intake & Discover/DefineDo Now (5 min): what's your plan for confirming this job's brief? Independent/team work (35 min): confirm the brief with the client and define the problem clearly. Document (5 min): log your problem statement.
Day 2Ideate & DesignDo Now (5 min). Independent/team work (35 min): generate options and build toward a strong draft. Check-in (5 min).
Day 3Client Approval & RevisionDo Now (5 min). Independent/team work (35 min): present the draft, log feedback, revise, and get sign-off. Debrief (5 min).
Day 4Production & DeliveryDo Now (5 min). Independent/team work (35 min): produce the final piece using the correct method and deliver/install it. Confirm with client (5 min).

✅ Assessment & Exit Ticket

Full job cycle scored with a rubric covering every pipeline stage: clear brief, genuine ideation, documented feedback/revision, correct production, confirmed delivery.

Exit Ticket: Which single stage of the pipeline gave you the most trouble on this job, and what would you do differently next time?

📊 Pull up the anonymous Class Check-In for students to fill out before they go.

🧩 Differentiation & Accommodations

English Language Learners: model every step live, then check in one-on-one; provide translated materials and vocabulary support as needed. Students with IEPs: apply the accommodations and modifications listed in each student's plan (examples include extended time, graphic organizers, speech-to-text tools, chunked instructions, and visual schedules). Students with attention-related needs: break tasks into short, checklist-driven steps and provide brief movement or focus breaks. Students ready for a challenge: take on a leadership role critiquing peers' work, extend the project with a second iteration, or research how today's skill is used professionally in the field.

🔗 Resources & References