Grade 12 • Unit S3.5: Extension & Enrichment (Optional) • Lesson 25 of 43 • 2 Days

Studio Systems Retrospective: What Should We Improve?

😄 Joke of the day: Why did the sketch feel proud of itself? Nobody said it had to be perfect the first time.

⏰ Do Now — Start Here

Think of one moment this semester when a studio job got stuck or confusing. What caused it?

🎯 Today's Big Question

📈 By the End of Today, You Will Be Able To

  1. Evaluate the studio's systems (intake, triage, approval, production, delivery) for strengths and weaknesses.
  2. Propose at least 2 specific, actionable improvements.
  3. Present recommendations to the class.

🧰 What You'll Need

📋 Your Plan for Today

Day 1: Evaluating the Systems

  1. Do Now (5 min, above).
  2. Mini-lesson (5 min): what a retrospective is and why real teams do them.
  3. Independent/team evaluation (30 min): evaluate each studio system stage (intake, triage, approval, production, delivery) for what worked and what didn't.
  4. Share (5 min).

Day 2: Proposing Improvements

  1. Do Now (5 min).
  2. Team work (25 min): propose at least 2 specific, actionable improvements with reasoning.
  3. Present (15 min): present recommendations to the class.

🖥️ Today's Slide Deck

Short, on-the-board pacing slides — project these to follow along. (The full details are in the handout above, not here.)

📚 Key Words

Retrospective
A structured look back at how a process worked, used to find specific improvements for next time.
Actionable
Specific and doable enough that someone could actually act on it, not just a vague complaint.

✅ What Your Finished Work Should Include

Recommendations scored with a rubric: specific, actionable, grounded in a real example from this semester.

Exit Ticket: Name the one improvement you most want the studio to make next year.

📊 Before You Leave

Quick, anonymous class check-in -- takes less than a minute.

Class Check-In

🔗 Want to Learn More?

🚀 The Extra Mile

Cross-Class Connection: The same structured retrospective format a Business/Agile-style project-management unit teaches.

Career Connection: Running a retrospective is a real, named practice in professional design studios and agencies.

Go further -- turn this into a portfolio piece: