Grade 9 โ€ข Unit 1: The Client & The Designer โ€ข Lesson 6 of 32 โ€ข 2 Days

Managing a Design Project

๐Ÿ—“๏ธ Before Class: Teacher Prep

๐Ÿ–จ๏ธ Student Handouts (print, one per class day)

Word + picture + definition + a short writing task for that day's vocabulary, in English, Spanish, French, Arabic, and Simplified Chinese.

๐Ÿ–ฅ๏ธ Slide Deck (project or share with students)

Short, on-the-board pacing slides for today's Do Now, agenda, vocabulary, and exit ticket -- the full detail lives in the handout above, not here.

๐Ÿง‘โ€๐Ÿซ Substitute Teacher Guide

A scripted, step-by-step runsheet for today's class -- hand this to anyone covering the room who doesn't know the daily routine.

๐ŸŽฏ Essential Question

๐Ÿ“ˆ Learning Objectives

By the end of this lesson (2 Days), students will be able to:

  1. List the 5 steps of the design project process in order: Planning & Analysis, Design, Building & Testing, Proofing & Revising, Implementation/Publishing.
  2. Define scope, pitch meeting, timeline, and scope creep.
  3. Map a sample project onto the 5-step process using a paper flowchart.

๐Ÿ“ Standards Alignment

CDOS (Career Development & Occupational Studies)

ACP (Adobe Certified Professional) Photoshop Exam Objectives

๐Ÿ“š Key Vocabulary

Pitch Meeting
The initial meeting with a client to discuss the project's basic goals and plan.
Scope
The work required to deliver a project's final product; changes to scope must be managed carefully.
Scope Creep
When a project keeps growing beyond its original plan, threatening the timeline and budget.
Timeline
A schedule that lays out when each part of a project should be finished.

๐Ÿงฐ Materials & Tools

๐Ÿง  Do Now (Warm-Up)

Answer Yes or No: Is it OK to work on a client project without ever communicating with the client? Why or why not?

๐Ÿ“‹ Main Workshop / Lesson Sequence

This lesson spans 2 Days. Suggested pacing:

DayFocusPlan
Day 1The 5-Step ProcessDo Now + discussion (5 min). Mini-lesson (15 min): introduce the 5 steps of managing a design project in order, with a real example for each. Vocabulary (10 min): scope, pitch meeting, timeline, scope creep -- and why scope creep is dangerous for a project's deadline and budget. Guided start (10 min): as a class, begin mapping the sample brief onto Step 1 (Planning & Analysis) together, so everyone starts Day 2 knowing what's expected. Preview (5 min): tomorrow, groups finish mapping all 5 steps on their own.
Day 2Mapping a ProjectDo Now (5 min): put the 5 project steps in order from memory. Group project (25 min): build a paper flowchart mapping the sample brief onto all 5 steps, with at least one specific detail per step. Gallery walk (10 min): groups post their flowcharts and compare approaches. Exit ticket (5 min).

โœ… Assessment & Exit Ticket

Flowchart rubric: all 5 steps present, in order, with at least one specific detail per step.

Exit Ticket: Put the 5 project steps in order from memory, then circle the one you think is easiest to skip by accident (and explain why that's risky).

๐Ÿ“Š Pull up the anonymous Class Check-In for students to fill out before they go.

๐Ÿงฉ Differentiation & Accommodations

English Language Learners: provide translated or bilingual glossaries, visuals, and sentence frames; pair with a peer for meaningful participation. Students with IEPs: provide extended time, step-by-step checklists, and one-on-one or small-group support as specified in each student's plan. Attention-related needs: break the task into smaller steps, use visual timers, and minimize distractions. Students who finish early: extend the task by adding a second design variation, mentoring a classmate, or writing a short reflection connecting today's skill to a career pathway.

๐Ÿ”— Resources & References